PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Assembling slip forms at Elev. 1,2,3 Facing South-East (800x600).jpg Building Rebar mats for Elev. 1,2,3 (800x600).jpg Forming wall forms along C.7 line from  4 to 6.5 line Facing South-West  -2.jpg Rebar inside wall forms along C.7 Facing South (800x600).jpg Wall form Rebar along C.7 Facing South (800x600).jpg Strip shear wall forms at Elev. 5-6 Facing East (800x600).jpg Strip shear walls forms at Elev. 5-6 Facing South-West (800x600).jpg Strip shear wall form at Elev. 5-6 Facing North-East (800x600).jpg Shear wall form on the ground Facing West (800x600).jpg
Previous pageNext page Wall form Rebar along C.7 Facing South (800x600)
Wall form Rebar along C.7 Facing South (800x600)